Thursday, 04/06/2020

Notice to Mariners

Depth of waters in front of wharves and access fairway to the port 70,000 DWT of Nam Van Phong general port project in Ninh Thuy Industrial Zone – Khanh Hoa province

NOTICE TO MARINERS

Depth of waters in front of wharves and access fairway to the port 70,000 DWT of Nam Van Phong general port project in Ninh Thuy Industrial Zone – Khanh Hoa province

No. 34/TBHH-TCTBĐATHHMN dated March 20 ,2020

KHA – 03 – 2020

Waters: Khánh Hòa province

VMS-South would like to inform that:

  1. Within surveyed waters at Wharf No.1:
Point VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
T1′ 12o30’18,1”N 109o15’47,9”E 12o30’14,4”N 109o15’54,4”E
T2 12o30’10,0”N 109o15’40,5”E 12o30’06,3”N 109o15’47,0”E
N1′ 12o30’12,2”N 109o15’38,1”E 12o30’08,4”N 109o15’44,5”E
LP6 12o30’20,3”N 109o15’45,5”E 12o30’16,6”N 109o15’51,9”E
  • Depth in meters to Chart Datum is 12,01m.
  1. Within surveyed fairway to go in port:
Point VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
LP1 12o30’39,1”N 109o18’19,8”E 12o30’35,4”N 109o18’26,2”E
LP2 12o30’27,5”N 109o16’10,8”E 12o30’23,7”N 109o16’17,3”E
LP3 12o30’31,3”N 109o15’56,3”E 12o30’27,6”N 109o16’02,8”E
LP4 12o30’30,9”N 109o15’49,9”E 12o30’27,2”N 109o15’56,3”E
LP5 12o30’26,2”N 109o15’45,6”E 12o30’22,5”N 109o15’52,0”E
LP6 12o30’20,3”N 109o15’45,5”E 12o30’16,6”N 109o15’51,9”E
LT4 12o30’15,2”N 109o15’51,3”E 12o30’11,5”N 109o15’57,7”E
LT3 12o30’16,0”N 109o15’57,3”E 12o30’12,3”N 109o16’03,7”E
LT2 12o30’22,6”N 109o16’11,3”E 12o30’18,9”N 109o16’17,7”E
LT1 12o30’33,5”N 109o18’12,5”E 12o30’29,8”N 109o18’19,0”E
  • Depth in meters to Chart Datum is 12,01m.
  • Within surveyed obstructing water obstacles in front of the wharves and access channel to the port works 70,000DWT Port facility of Nam Van Phong General Port project in Ninh Thuy Industrial Zone – Khanh Hoa province is limited by the points with the above coordinates. There is no dangerous obstacles.
  • Data based on paper chart symbolized 1/9 ÷9/9, ratio 1/1000 was surveyed Portcoast Consultant Corporation completed on March 2020.
  • More information contact Thanh Yên Vân Phong JSC./.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Pham Tuan Anh


Other notice

The sunken TV 1954 barge in Soai Rap fairway

Depth of Tat canal fairway from Km 0-650 (Km 30+687 -:- Km 31 +332,5 of package 11) to Km 8+175 of package 6A, 6B and fairway section from Km 0+000 đến Km 0+678 of package 10B – the fairway project which used for large load vessels navigating in and out Hau River.

The new establishment of specialized buoy “NV1” và “NV2″ controlling the construction area to maintain and maintain fairway for large tonnage vessels entering the Hau River in 2018

Termination of operation of 04 buoys, specialized signals “TH1″, “TH2″, “TH3″ and “TH4″ belonging to the National Power Supply Works project for Tien Hai commune, Kien Giang province

Parameters of fairway for large load vessel in and out of Hau River