Sunday, 28/02/2021

Notice to Mariners

Parameters depth of waters in front of 15.00DWR import habour of Thang Long cement grinding station in Hiep Phuoc industrial zone, Nha Be district, HCM C

NOTICE TO MARINERS

Parameters depth of waters in front of 15.00DWR import habour of Thang Long cement grinding station in Hiep Phuoc industrial zone, Nha Be district, HCM C

 No. 283/TBHH-TCTBĐATHHMN dated December 8, 2020

HCM – 65 – 2020

Waters: HCM C

Fairway: Soài Rạp

 

Southern Vietnam Maritime Safety Corporation would like to inform that:

Within range of surveyed waters in front of 15.00DWR import habour

, limited by points with coordinates as follows:

Points VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
CN1 10°39’13,32”N 106°44’19,63”E 10°39’09,62”N 106°44’26,13”E
CN2 10°39’13,41”N 106°44’21,61”E 10°39’09,71”N 106°44’28,11”E
CN3 10°39’20,84”N 106°44’16,95”E 10°39’17,14”N 106°44’23,45”E
CN4 10°39’19,01”N 106°44’16,06”E 10°39’15,31”N 106°44’22,56”E

- Depth is determined by 200kHz echo sounding apparatus to Chart Datum is 8,21m.

Depth data is based on the graph of symbols TL_11.2020, scale of 1/500, measured by Vietnam Long Investment Consulting Joint Stock Company in November 2020.

For more information, contact the Branch of Thang Long Cement Joint Stock Company (1)./.

SIGN ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

(Signed and Sealed)

Phạm Tuấn Anh


Other notice

Depth of waters in front of 50000 DWT barge wharf – Thi Vai-Holcim Viet Nam Clinker Grinding Station

Dredging depth of Quy Nhơn fairway in 2017

The new establishment of specialized buoy “NV1” và “NV2″ controlling the construction area to maintain and maintain fairway for large tonnage vessels entering the Hau River in 2018

(Vietnamese) Về việc thi công nạo vét luồng Soài Rạp giai đoạn 2

(Vietnamese) Độ sâu sau nạo vét duy tu các đoạn cạn luồng Sài Gòn – Vũng Tàu năm 2012