Friday, 19/04/2024
Sorry, this entry is only available in Vietnamese.
(Vietnamese) Độ sâu khu nước trước bến A cảng Cái Mép Gemadept – Terminal Link GĐ1
The construction of pipe spreading, PLEM installation, underground spools connection construction, pre-trial run, test run, dug trench buried under the project “Pipeline for gathering and transporting gas of Sao Vang – Dai Nguyet gas field “
Depth of waters in front of wharf No.01 and No.02 Phan Thiet port of Trung Nguyen Steel and Trung Nguyen Mining And Contruction Materials Production Joint-Stock Company
(Vietnamese) Về việc Thiết lập mới báo hiệu nổi: Phao báo hiệu chuyên dùng “BN1”, “BN2” khống chế xác tàu Biển Nam 17 bị chìm trên luồng Sài Gòn – Vũng Tàu
Specialized area: secure corridor of Dai Hung oil field – 05.1a slot