NOTICE TO MARINERS
Depth of Dam Son fairway
No. 39/TBHH-TCTBĐATHHMN dated May 30,2018
KHA – 03 – 2018
Waters: Khánh Hòa province.
Fairway: Đầm Môn.
VMS-South would like to inform that:
Within survey Đầm Môn fairway, 16,5km in length, 200m in width is limited and guided by AtoN system, depth in meters to Chart Datum is 17,3m.
NAVIGATION GUIDANCE:
All vessels navigating on Vung Ro fairway should follow AtoN system, absolutely comply with appointment of Maritime Administration of Nha Trang for maritime safety.