Friday, 30/10/2020

Notice to Mariners

Depth of water Định An – Sông Hậu fairway (from buoy “0” to upstream of buoy “21” + 1430m)

NOTICE TO MARINERS

Depth of water Định An – Sông Hậu fairway (from buoy “0” to upstream of buoy “21” + 1430m)

No. 247/TBHH-TCTBĐATHHMN dated October 7,2019

TVH – 21 – 2019

Waters:      Trà Vinh province.

Fairway:     Định An – Sông Hậu.

Segment: From buoy “0” to upstream of buoy “21” + 1430m

VMS-South would like to inform that:

Within surveyed waters at Định An – Sông Hậu fairway, limited and guided by AtoN:

  1. Segment Định An (from buoy “0” to buoy “16”) 18,7km in length, 100m in width:

- From buoy “0” to upstream of buoy 2” + 730m, 2,6km in length, depth in meters to Chart Datum is 3,1m.

- From buoy “2” + 730m to upstream of buoy “4A” + 400m, 2,7km in length, depth in meters to Chart Datum is 1,9m.

- From upstream of buoy “4A” + 400m to upstream of buoy “6A” +180m, 3,1km in length, depth in meters to Chart Datum is 2,2m.

- From upstream of buoy “6A” +180m to downstream of buoy “10” – 700m, 1,8km in length, độ sâu đạt 2,5m trở lên.

- From downstream of buoy “10” – 700m to upstream of buoy “9” + 100m, 1,9km in length, depth in meters to Chart Datum is 2,1m.

- From downstream of buoy “9” + 100 to buoy “12”, 1,2km in length, depth in meters to Chart Datum is  3,0m.

- From buoy “12” to buoy “16”, 5,4km in length, depth in meters to Chart Datum is 4,0m.

  1. From buoy “16” to upstream of buoy “21” + 1430m, 200m in width of bottom, 14,3km in length, depth in meters to Chart Datum is 4,6m.

NAVIGATION GUIDANCE:

All vessels navigating on Định An – Sông Hậu fairway when passing through the maintenance dredging area marked by the above signs of strengthening the realm, comply strictly with the regulation of Cần Thơ Maritime Administration for maritime safety.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Pham Tuan Anh


Other notice

TV2177 Tug Boat and SL4495 Barge were sunk on Sai Gon – Vung Tau Fairway

Depth after maintenance dredging of Soai Rap fairway in 2016

151/TBHH-TCTBĐATHHMN – Regarding the change of the characteristic of aid to navigation buoys Soairap – Hiepphuoc Channel

Geochemical surveying activities of oil and gas projects at Lot 114 & 116 offshore Vietnam

Execution of maintenance dredging the area in front of wharfs no. 2, 3 of International Newport Cai Mep Port (TCIT) in Tan Phuoc Commune, Tan Thanh District, Ba Ria-Vung Tau Province