The parameters depth of the mooring anchorage area in front of the large load ships 2.000 DWT wharf in Thang Long Cement Grinding Station, Hiep Phuoc Industrial Park, Nha Be District, HCMC

NOTICE TO MARINERS

The parameters depth of the mooring anchorage area in front of the large load ships 2.000 DWT wharf in Thang Long Cement Grinding Station, Hiep Phuoc Industrial Park, Nha Be District, HCMC

138/TBHH-TCTBĐATHHMN dated June 11, 2024

HCM – 22 – 2024

Waters: HCMC

Fairway: Soai Rap

 

VMS-South would like to inform that the parameters depth of the mooring anchorage area in front of the large load ships 2.000 DWT wharf in Thang Long Cement Grinding Station, Hiep Phuoc Industrial Park, Nha Be District, HCMC as follows:

  1. Within range of surveyed the waters in front of the large load ships 2.000 DWT wharf limited by points with coordinates as follows:
Points VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
NC-01 10039’14,24”N 106044’18,24”E 10039’10,54”N 106044’24,74”E
NC-02 10039’16,53”N 106044’16,79”E 10039’12,83”N 106044’23,29”E
NC-03 10039’16,05”N 106044’16,01”E 10039’12,35”N 106044’22,51”E
NC-04 10039’13,75”N 106044’17,46”E 10039’10,05”N 106044’23,96”E

- Depth determined by echo sounding 200 kHz frequency to chart datum is 5,92 m.

  1. Within range of surveyed and scanned dangers limited by points with coordinates mentioned above, there is no any danger detected.

For further information, please contact directly to The Branch of Thang Long Cement Joint Stock Company (1).

Note: The sounding data is based on the sounding chart signed TL_05.2024_2 and the scanned dangers chart sign TL_05.2024.RQ scale 1/500 supplied by The Branch of Thang Long Cement Joint Stock Company enclosed with the request no. 29/CV/TLCC/2024/CN received dated June 11, 2024./.


Other notice

(Vietnamese) Về việc thi công nạo vét duy tu luồng sông Dinh năm 2013

(Vietnamese) Về thông số kỹ thuật của luồng hàng hải Vũng Tàu – Thị Vải đoạn từ phao số “0” đến cặp phao số “6”,“7” sau tai nạn tàu HEUNG A DRAGON bị chìm.

Depth of of waters at anchorage zone to temporarily transfer at Duyên Hải – Trà Vinh in HAIVANSHIP

The construction area for dredging and maintenance of specialized navigational channels, turning basin, mooring area and water area in front of Hydrocarbon port of Southern Vietnam Petrochemical Complex

Change of Characteristics Operation of Buoys no. “1”, “3”, “5”, “7”, “9”, “12” on Dinh An-Song Hau fairway