Friday, 29/03/2024

Notice to Mariners

Depth of Dinh An-Can Tho fariway: Approach channel

NOTICE TO MARINERS

Depth of Dinh An-Can Tho fariway: Approach channel

No.121/TBHH-TCTBĐATHHMN dated June 22, 2016

TVH – 22 – 2016.

Waters: Tra Vinh province

Fairway: Dinh An-Can Tho

Southern Vietnam Maritime Safety Corporation would like to inform:

Within range of surveyed Dinh An-Can Tho fairway from buoy “0”to buoy “16” is 17km in length, 100m in width, limited and guided by AtoN system, depth in meters to Chart Datum as follows:

  1. Section from buoy “0” to downstream of buoy “3” -350m, depth is 3.7m.
  2. Section from downstream of buoy “3”-350m to upstream of buoy “12”+210m as follows:

- Shallow points exist on starboard side‘s edge which are 2.8m; 2.9m in the following positions:

Depths (m) VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
2.8 09026’58,2”N 106026’16,0”E 09026’54,6”N 106026’22.5”E
2.9 09026’58,4”N 106026’14.3”E 09026’54.7”N 106026’20.7”E
2.9 09026’59,1”N 106026’02,9”E 09026’55.4”N 106026’09.3”E
2.9 09027’06,9”N 106025’40,9”E 09027’02.9”N 106025’47,4”E
2.9 09027’08,6”N 106025’38,4”E 09027’04,9”N 106025’44,9”E
2.9 09027’11,6”N 106025’34,6”E 09027’08,0”N 106025’41,0”E
  • Except shallow points mentioned above, depth is 3.0m.
  1. Section from upstream of buoy “12”+210m to buoy “16” is 3.5m in depth.

NAVIGATION GUIDANCE:

All means navigating on Dinh An-Can Tho fairway route from buoy “0” to buoy “16” have to follow AtoN system, pay attention to shallow points mentioned above for maritime safety.


Other notice

The sinking of the Tuan Tu 09 vessel in the waters of Binh Thuan province

The parameters depth in front of the wharf, the turning basin and the special fairway of Van Phong BOT Thermal Power Plant

(Vietnamese) Kéo giàn khoan ĐH-01 từ lô 05.1a đến cảng Dung Quất, Quảng Ngãi và kéo phao CALM về Vũng Tàu

The parameters depth of the waters in front of PV Shipyard wharf

Depth of waters in front of wharf 20.000 DWT in Navioil port