Monday, 28/04/2025

Notice to Mariners

Depth of Dinh River fairway

NOTICE TO MARINERS

Depth of Dinh River fairway

No.35/TBHH-TCTBĐATHHMN dated February 24, 2017

VTU – 07 – 2017

Locality: Ba Ria-Vung Tau.

Fairway: Dinh river.

Southern Vietnam Maritime Safety Corporation would like to inform:

Within range of surveyed Dinh river fairway limited and guided by Aton System, is 16.6km in length, depth in meters to Chart Datum as follows:

  1. The section at sea (from Vung Tau-Thi Vai fairway to VietsoPetro Port) is 7.5km in length, 100m in width.

- Shallow section exists in the following position’s coordinates:

Depth

(m)

VN-2000 WGS – 84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
6,8 10°23’53,7” N 107°03’31,1” E 10°23’50,0” N 107°03’37,5” E
6,8 10°23’53,5” N 107°03’37,6” E 10°23’49,8” N 107°03’44,0” E
6,7 10°23’52,4” N 107°03’44,0” E 10°23’48,8” N 107°03’50,5” E
6,9 10°23’52,3” N 107°05’49,2” E 10°23’48,7” N 107°05’55,6” E
6,7 10°23’48,6” N 107°05’21,6” E 10°23’44,9” N 107°05’28,1” E
6,7 10°23’38,0” N 107°05’05,7” E 10°23’34,3” N 107°05’12,1” E
6,8 10°23’36,9” N 107°05’06,8” E 10°23’33,2” N 107°05’13,3” E

- Except shallow section mentioned above, depth is 7.0m

  1. The section from Vietsopetro Port to upstream of Vina Offshore port 200m is 2km in length, depth is 5.8m.
  2. The section from upstream of Vina Offshore port 200m to Cay Khe river junction is 7.1km in length, 80m in width.

- Shallow point exists in the following position’s coordinates:

Depth

(m)

VN-2000 WGS – 84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
4,4 10°25’10,6” N 107°08’31,0” E 10°25’06,9” N 107°08’37,5” E
4,3 10°25’12,3” N 107°08’33,8” E 10°25’08,6” N 107°08’40,3” E
4,3 10°25’12,5” N 107°08’33,6” E 10°25’08,9” N 107°08’40,1” E
4,4 10°25’13,5” N 107°08’34,9” E 10°25’09,9” N 107°08’41,4” E
4,6 10°25’14,6” N 107°08’36,1” E 10°25’10,9” N 107°08’42,5” E
4,5 10°25’18,0” N 107°08’39,2” E 10°25’14,4” N 107°08’45,6” E

- Except shallow points mentioned above, depth is 4.7m.

NAVIGATION GUIDANCE:

All means navigating on Dinh river fairway should follow Aton System for maritime safety.


Other notice

The depth of leading ways, turning basin and waters in front of Vinh Tan port 2, Binh Thuan Province

The parameters depth of the mooring anchorage area in front of the large load ships 2.000 DWT wharf in Thang Long Cement Grinding Station, Hiep Phuoc Industrial Park, Nha Be District, HCMC

The parameters depth of the waters in front of warehouse VK 102/ The 7th Military Region

Firing ammunition rehearsal on High Command of Navy’s waters

Depth of water at fairway and turning basin Binh Tri – Kien Giang.