NOTICE TO MARINERS

Depth of waters in front of Dong Thap Petroleum wharf  (wharf 5.000DWT) on Tien river in Dongthap Petroleum Trading Import Export JSC

No. 237/TBHH-TCTBĐATHHMN dated October 24, 2022

DOT – 01 – 2022

Waters: Dong Thap province.

Fairway: Tien river.

VMS-South would like to inform that Depth of waters in front of Dong Thap Petroleum wharf  (wharf 5.000DWT) on Tien river in Dongthap Petroleum Trading Import Export JSC:

Within surveyed waters in front of wharf :

Point VN 2000 WGS 84
Latitude Longitude Latitude Longitude
K1 10°30’30,7”N 105°33’33,9”E 10°30’27,1”N 105°33’40,3”E
K2 10°30’31,1”N 105°33’31,3”E 10°30’27,5”N 105°33’37,7”E
K3 10°30’24,0”N 105°33’34,0”E 10°30’20,3”N 105°33’40,5”E
K4 10°30’26,0”N 105°33’35,7”E 10°30’22,4”N 105°33’42,2”E

The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 9,9 m.

More information contact to Dongthap Petroleum Trading Import Export JSC.

 

 

 

 

 


Other notice

Parameters depth in front of Gas PVC Phước Thái Port

The parameters depth of the waters area in front of wharf PVC-MS, at the PVC-MS Metal Structure Fabrication Yard Port

New establishment of 03 the buoys “SR1”, “SR2”, “BP” serving construction works: Dredging and maintaining the Soai Rap fairway in 2021

Depth of waters on Nha Trang fairway alignment adjustment from point TL1′ to point TL4′

New establishment of buoys serving the construction of Phuoc An bridge