Thursday, 20/03/2025

Notice to Mariners

The parameters depth of Turning basin VQ2 – Long Son Industrial Zone Wharf

NOTICE TO MARINERS

The parameters depth of Turning basin VQ2 – Long Son Industrial Zone Wharf

 No.173/TBHH-TCTBĐATHHMN dated July 09, 2024

VTU – 34 – 2024

Waters: Ba Ria-Vung Tau Province

Fairway: entry of Based Zone 2/QCHQ Wharf to Long Son Industrial Zone Wharf

 

VMS-South would like to inform that the parameters depth of Turning basin VQ2 – Long Son Industrial Zone Wharf, with the following details:

  1. Within range of the surveyed turning basin VQ2, limited by circle with diameter of 181 m, center in the position with coordinates as follows:
Turning basin VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
VQ2 10˚28’42,58″N 107˚02’50,87″E 10˚28’38,91″N 107˚02’57,29″E
  • Depth determined by echo sounding 200 kHz frequency to chart datum is 6,0 m.
  1. Within range of surveyed and scanned dangers which limited by points with coordinates mentioned above, there is no any danger detected.

For further information, please contact directly with LONG SON INTERNATIONAL PORT JOINT STOCK COMPANY (1).

        Notes: The sounding data is based on the sounding chart signed BV01 scale 1/1.000 supplied by LONG SON INTERNATIONAL PORT JOINT STOCK COMPANY enclosed with the request no. 09/ĐĐN-CTCPCQTLS dated June 09th, 2024./.


Other notice

The new establishment of specialized buoy “NV1” và “NV2″ controlling the construction area to maintain and maintain fairway for large tonnage vessels entering the Hau River in 2018

The parameters depth of waters in front of Vinh Tan 4 Thermal Power Plant

(Vietnamese) Về việc cấm luồng hàng hải phục vụ thi công tuyến cáp quang qua sông Soài Rạp

New establishment of specialized buoys “B1”, “B2” that marking construction area of ​​Ca Mau wind power plant 1B

(Vietnamese) Độ sâu khu nước trước cảng Thương cảng Vũng Tàu