NOTICE TO MARINERS
The position of regulating station No. 1 and 2 for the construction of Package F of the South Vietnam Petrochemical Complex Project
No. 106/TBHH-TCTBĐATHHMN dated May 24, 2019
VTU – 29 – 2019
- Waters: Bà Rịa – Vũng Tàu province.
- Fairway: Vũng Tàu – Thị Vải.
VMS-South would like to inform that: Location of regulating station No. 1 and 2 for construction of Package F of the South Vietnam Petrochemical Complex Project, with the following coordinates:
Regulative station | VN-2000 | WGS-84 | ||
Latitude (j) | Longitude (l) | Latitude (j) | Longitude (l) | |
1 | 10°25’28,1”N | 107°02’54,2”E | 10°25’24,4”N | 107°03’00,6”E |
2 | 10°27’03,8”N | 107°01’16,2”E | 10°27’00,1”N | 107°01’22,6”E |
NAVIGATION GUIDANCE:
All vessels navigating on Ganh Rai Bay area, Vung Tau – Thi Vai maritime fairway, passing the construction area of the South Vietnam Petrochemical Complex Project, strengthening the realm, keeping in touch smoothly, absolutely comply with the mobilization of Vung Tau Maritime Port Authority and field regulating force to ensure maritime safety.
ON BEHALF OF DIRECTOR GENERAL DEPUTY DIRECTOR GENERAL
Signed and Sealed
Tran Duc Thi |