Notice to Mariners

The stopped operation of AtoN specialized buoys named “PT1”, “PT2” which limited the construction of Cai Con General Port

 NOTICE TO MARINERS

The stopped operation of AtoN specialized buoys named “PT1”, “PT2” which limited the construction of Cai Con General Port

No.197/TBHH-TCTBĐATHHMN dated August 06th, 2024

 

STG – TG – 05 – 2024

- Waters: Soc Trang Province.

- Fairway: Dinh An – Hau River.

- AtoN specialized buoys named: “PT1”, “PT2”.

- Geographical coordinates:

 

AtoN specialized buoys named VN-2000 WGS-84
  Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
“PT1” 09°54’04,0”N 105°55’49,7”E 09°54’00,3”N 105°55’56,1”E
“PT2” 09°53’56,9”N 105°55’57,9”E 09°53’53,3”N 105°56’04,3”E

 

VMS-South would like to inform that two AtoN specialized buoys named “PT1”, “PT2” which limited the construction of Cai Con General Port located in An Lac Thon Hamlet, Ke Sach District, Soc Trang Province has been stopped operation since July 31st, 2024.

The Notice to Mariners no. 44/TBHH-TCTBĐATHHMN issued by Southern Vietnam Maritime Safety Corporation dated February 20th, 2023 has expired./.


Other notice

Depth of waters in front of The barge wharf exports 800 DWT Port SCC-VN Thi Vai

The new establishment of specialized buoy “H1”, “H2” serving dredging of Hà Tiên fairway

New establishment of AIS on Buoy “GR” on Vung Tau – Thi Vai fairway

(Vietnamese) Độ sâu sau nạo vét duy tu các đoạn cạn khu vực 2 và 3 thuộc đoạn luồng từ Km7+440 đến Km37+400 (từ sông Cái Mép đến phao số “0”) luồng hàng hải Vũng Tàu – Thị Vải năm 2016

The new establishment of special buoys named “K1”, “K2” serving the Stone embankment construction to prevent landslide of Tien River, Cu Lao Tan Long section