Monday, 13/01/2025

Notice to Mariners

The stopped operation of AtoN specialized buoy named “DH1” serving the dredging and maintenance construction of specialized wharf which belongs to Duyen Hai 2 Thermal Power Plant Project.

NOTICE TO MARINERS

The stopped operation of AtoN specialized buoy named “DH1” serving the dredging and maintenance construction of specialized wharf which belongs to Duyen Hai 2 Thermal Power Plant Project.

No.288/TBHH-TCTBĐATHHMN dated November 12, 2024

TVH – TG – 46 – 2024

- Waters: Tra Vinh Province.

- AtoN specialized buoy named: “DH1”.

- Geographical coordinates:

AtoN specialized buoy named VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
“DH1” 09˚25’49,40”N 106˚39’27,82”E 9˚25’45,73″N 106˚39’34,23″E

 

 

VMS-South would like to inform that AtoN specialized buoy named “DH1” serving the dredging and maintenance construction of specialized wharf which belongs to Duyen Hai 2 Thermal Power Plant Project, has been stopped operation since November 08th, 2024.

The Notice to Mariners no. 225/TBHH-TCTBĐATHHMN issued by Southern Vietnam Maritime Safety Corporation dated September 13th, 2024 has expired./.


Other notice

Change of the characteristics of buoys “5” on Định An – Cần Thơ fairway

(Vietnamese) Về việc thiết lập mới phao báo hiệu vùng nước cảng Kho xăng dầu ngoại quan Vân Phong

Geological survey in Block 11-2 / 11, Vietnam Continental Shelf Offshore

Announced the existence of newly discovered dangerous obstruction, which are shoals in the waters of Ba Ria – Vung Tau province

(Vietnamese) Độ sâu luồng Vũng Tàu-Thị Vải