NOTICE TO MARINERS
The stopped operation of AtoN specialized buoy named “DH2” serving the dredging and maintenance of Duyen Hai Power Center Wharf construction phase 2 in 2024 which has been stopped operation since November 06th, 2024.
No.286/TBHH-TCTBĐATHHMN dated November 11, 2024
TVH – TG – 45 – 2024
- Waters: Tra Vinh Province.
- AtoN specialized buoy named: “DH2”.
- Geographical coordinates:
AtoN specialized buoy named | VN-2000 | WGS-84 | ||
Latitude (φ) | Longitude (λ) | Latitude (φ) | Longitude (λ) | |
“DH2” | 09°27’26,75”N | 106°40’17,86”E | 09°27’23,08”N | 106°40’24,27”E |
VMS-South would like to inform that AtoN specialized buoy named “DH2” serving the dredging and maintenance of Duyen Hai Power Center Wharf construction phase 2 in 2024 which has been stopped operation since November 06th, 2024.
The Notice to Mariners no. 236/TBHH-TCTBĐATHHMN issued by Southern Vietnam Maritime Safety Corporation dated 20/9/2024 has expired./.