Monday, 13/01/2025

Notice to Mariners

The stopped operation of AtoN specialized buoy named “DH2” serving the dredging and maintenance of Duyen Hai Power Center Wharf construction phase 2 in 2024 which has been stopped operation since November 06th, 2024.

NOTICE TO MARINERS

The stopped operation of AtoN specialized buoy named  “DH2” serving the dredging and maintenance of Duyen Hai Power Center Wharf construction phase 2 in 2024 which has been stopped operation since November 06th, 2024.

No.286/TBHH-TCTBĐATHHMN dated November 11, 2024

TVH – TG – 45 – 2024

- Waters: Tra Vinh Province.

- AtoN specialized buoy named: “DH2”.

- Geographical coordinates:

AtoN specialized buoy named VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
“DH2” 09°27’26,75”N 106°40’17,86”E 09°27’23,08”N 106°40’24,27”E

 

 

VMS-South would like to inform that AtoN specialized buoy named “DH2” serving the dredging and maintenance of Duyen Hai Power Center Wharf construction phase 2 in 2024 which has been stopped operation since November 06th, 2024.

The Notice to Mariners no. 236/TBHH-TCTBĐATHHMN issued by Southern Vietnam Maritime Safety Corporation dated  20/9/2024 has expired./.


Other notice

Depth of waters on rach Gia fairway

153/TBHH-TCTBĐATHHMN – Characteristic modification of aid to navigation buoys on Dinhan-Cantho channel

Depth of waters in morring buoy wharves SSV01 and SSV02 of SSV Ltd., Co (SSV Corp)

Depth of waters in front of wharf V3&V4 – VICT port on Sai Gon River

The parameters depth of Phan Thiet fairway