Saturday, 22/03/2025

Notice to Mariners

Permanently withdrawn of buoy “B1” on Vung Tau – Thi Vai fairway

NOTICE TO MARINERS

Permanently withdrawn of buoy “B1” on Vung Tau – Thi Vai fairway
No. 15/TBHH-TCTBĐATHHMN dated January 20, 2017

VTU – TG – 05 – 2017

  • Waters: Ba Ria – Vung Tau Province
  • Fairway: Vung Tau – Thi Vai
  • Marks: Buoy “B1”
  • Co-ordinates:
Buoy VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“B1” 10035’06,7” N 107001’34,9” E 10035’03,0” N 107001’41,4” E

VMS-South would like to inform: Buoy “B1” on Vung Tau – Thi Vai fairway has been permanently withdrawn since 18/01/2017.


Other notice

Technical specifications Hon Lon lighthouse – Khanh Hoa province

Termination of special buoys “X1” “X2” limited water area for construction of Vinh Tan 1 Thermal Power Plant, Binh Thuan Province

Depth of Định An – Hậu river fairway “ section from buoy “21” to Gòi Lớn channel”

Change characteristics of Ho Tau lighthouse, in Tra Vinh Province