Sorry, this entry is only available in Vietnamese.
Saturday, 19/04/2025
Depth of waters in front of wharves 2A, 3A, 4A and 1B of Nha Be Petroleum depot
Geophysical survey at Block 11-2/11, Vietnam Offshore
Construction area for dredging and maintenance of SP-PSA International Port in 2023
The parameters depth of waters in front of Vinh Tan 4 Thermal Power Plant