NOTICE TO MARINERS
Regarding the termination of the operation of specialized maritime signaling buoys for the construction of dredging works to maintain navigation channels for large tonnage ships entering the Hau River in 2020
No. 231 /TBHH-TCTBĐATHHMN dated September 24, 2021
TVH – 22 – 2021
Waters: Tra Vinh province.
Fairway: For large tonnage ships into the Hau River.
Buoy: “SH1”, “SH2”, “SH3”.
Coordinates:
Buoy | VN-2000 | WGS-84 | ||
Latitude (j) | Longitude (l) | Latitude (j) | Longitude (l) | |
“SH1” | 09032’38,69”N | 106032’44,60”E | 09032’35,02”N | 106032’51,00”E |
“SH2” | 09036’39,91”N | 106016’30,66”E | 09036’36,25”N | 106016’37,07”E |
“SH3” | 09027’18,37”N | 106037’44,85”E | 09027’14,70”N | 106037’51,26”E |
VMS-South would like to inform that: The buoys “SH1”, “SH2”, “SH3” which are stopped operation, date on September 22, 2021.
Notice to mariners No.144/TBHH-TCTBĐATHHMN date on May 28, 2021 of VMS-South that is cancelled.
ON BEHALF OF DIRECTOR GENERAL DEPUTY DIRECTOR GENERAL
Signed and Sealed
Dinh Thai Cong |