Notice to Mariners

Terminated operation of the specialized buoys “TA1”, “TA2” serving Tan An 1 Wind Plant Project (phase 1), Ca Mau province

NOTICE TO MARINERS

Terminated operation of the specialized buoys “TA1”, “TA2” serving Tan An 1 Wind Plant Project (phase 1), Ca Mau province

No. 201/TBHH-TCTBĐATHHMN dated September 12 ,2022

CMU – 01 – 2021

  • Waters: Ca Mau province

- Buoys: “TA1”, “TA2”

- Coordinates:

Buoy  VN-2000  WGS-84
Latitude Longitude Latitude Longitude
“TA1” 08˚38’38,38″N 105˚09’04,73″E 08038’34,74″N 105009’11,13″E
“TA2” 08˚39’50,84″N 105˚10’22,90″E 08039’47,20″N 105010’29,30″E

VMS-South would like to inform that:

The specialized buoys “TA1”, “TA2” serving Tan An 1 Wind Plant Project (phase 1), Ca Mau province terminates operation from August 29, 2022.

Notice to mariners No. 267/TBHH-TCTBĐATHHMN dated November 10, 2021 of VMS-South that is cancelled.


Other notice

(Vietnamese) Độ sâu luồng An Thới

Parameters of Con Son – Con Dao fairway

Depth of waters in front of VIETSOVPETRO wharf, Dinh River Fairway

Depth of waters at Ba Ngoi Pilot Boarding area

The plan to drag the Shelf Drilling Scepter flatform from the SDNE-1P-ST drilling well, lot 15-1 to Singapore