Wednesday, 30/09/2020

Notice to Mariners

Regarding the termination of the operation of the buoy “V1″, “V2″ mark obstacles at the area of ​​VIETSUN INTEGRITY ship sank on the Saigon – Vung Tau fairway

NOTICE TO MARINERS

Regarding the termination of the operation of the buoy “V1″, “V2″ mark obstacles at the area of ​​VIETSUN INTEGRITY ship sank on the Saigon – Vung Tau fairway

No. 256/TBHH-TCTBĐATHHMN dated November 21,2019

HCM – TG – 51 – 2019

- Waters:                 Hồ Chí Minh city

- Fairway:               Sài Gòn – Vũng Tàu

- Buoys:                  “V1”, “V2”

Coordinates:

Buoys VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“V1” 10°32’44,8”N 106°50’52,8”E 10°32’41,1”N 106°50’59,2”E
“V2” 10°33’00,4”N 106°50’52,1”E 10°32’56,7”N 106°50’58,5”E

VMS-South would like to inform that:

BUoys “V1”, “V2” mark obstacles in the area of ​​VIETSUN INTEGRITY ship sank on the Saigon – Vung Tau fairway to cease operation from November 20, 2019.

Notice to mariner No. 212/TBHH-TCTBĐATHHMN ngày 19/10/2019 của Tổng công ty Bảo đảm an toàn hàng hải miền Nam hết hiệu lực./. dated 19 October 2019 of Southern Vietnam Maritime Safety Corporation is cancel./.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Tran Duc Thi


Other notice

Fishing stakes in Vung Tau-Thi Vai fairway

The depth of waters in front of Tan Cang Hiep Phuoc wharf, leading ways to fairway and 2.000DWT wharf on Dong Dien River

Suspending operation of buoy “19” on Soai Rap fairway

Changing the lighting characteristics of Vung Tau lighthouse

Depth of 03 mooring buoys on Hau River, Thot Not rice market