Wednesday, 11/12/2024

Notice to Mariners

Termination of buoy no. “7” on Phu Quy fairway

NOTICE TO MARINERS

Termination of buoy no. “7” on Phu Quy fairway

No. 119/TBHH-TCTBĐATHHMN dated May 12, 2021

BTN – TG – 10 – 2021

Waters:          Binh Thuan Province

Fairway:        Phu Quy

AtoN buoy no.: “7”

- Geographical Coordinates:

AtoN buoy no. VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“7” 10°30’14,4”N 108°57’00,2”E 10°30’10,7”N 108°57’06,7”E

 

VMS-South would like to inform that: The AtoN buoy no. “7” on Phu Quy fairway has been terminated since May 10, 2021./.

SIGN ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

(Signed and Sealed)

Phạm Tuấn Anh


Other notice

The new establishment of buoys “T1”, “T2”, “T3” serving construction of Hiep Thanh Wind Power Plant

Depth of approach channel to Ben Dam Port, Con Dao Ward

Pausing maritime operation ofbeacon no. “13” SàiGòn – VũngTàu fairway

Depth of shallow section of Nam Can-Bo De fairway, from upstream Buoy “0” to upstream Buoy “12” +1500m

Geological survey drilling construction area for technical design steps of Dai Ngai 1 bridge, Dai Ngai bridge construction investment project on Highway 60 in Tra Vinh and Soc Trang provinces