Sorry, this entry is only available in Vietnamese.
Thursday, 24/04/2025
129/TBHH-TCTBĐATHHMN – Depth of Vungtau – Thivai channel
The temporarily stopped operation of Isolated danger buoy named “J” on Tien River fairway
Changing characteristics of the operation of buoys “28” on Saigon – Vung Tau fairway
Installing drilling platform at Block 15-1, Vietnam offshore