Conducting dredging construction area for barge berth under Cai Mep Gemadept Port – Terminal Link project, phase 1

NOTICE TO MARINERS

Conducting dredging construction area for barge berth under Cai Mep Gemadept Port – Terminal Link project, phase 1

No. 160/TBHH-TCTBĐATHHMN dated July 25, 2023

VTU – 31 – 2023

Waters: Ba Ria – Vung Tau.

Fairway: Vung tau-Thi Vai.

VMS-South would like to inform that dredging construction area for barge berth under Cai Mep Gemadept Port – Terminal Link project, phase 1:

  1. Within surveyed dredging :
Point  VN2000  WGS84
Latitude Longitude Latitude Longitude
S1 10029’46,06”N 106059’59,37”E 10029’42,39”N 107000’05,80”E
S2 10029’45,06”N 107000’02,93”E 10029’41,39”N 107000’09,35”E
S3 10029’43,10”N 107000’05,48”E 10029’39,43”N 107000’11,90”E
S4 10029’35,43”N 107000’05,37”E 10029’31,76”N 107000’11,79”E
NV1 10029’30,45”N 107000’00,18”E 10029’26,77”N 107000’06,60”E
NV2 10029’33,42”N 106059’59,02”E 10029’29,75”N 107000’05,44”E
NV3 10029’36,14”N 106059’58,28”E 10029’32,46”N 107000’04,70”E
NV4 10029’37,80”N 106059’58,70”E 10029’34,12”N 107000’05,12”E
M4 10029’37,78”N 106059’59,25”E 10029’34,11”N 107000’05,68”E

2. Construction time: estimated 60 days from the date of commencement.

  1. Characteristics of construction vehicles: Leggings, bottom-loading barges, tugs.

 

NAVIGATION GUIDANCE

All vessels above, pay attention to special buoys mentioned above, keep safety distance, keep watching, keep smoothly communication and absolutely comply with appointment of Maritime Administration of Vung Tau.


Other notice

(Vietnamese) Về khu vực chuyên dùng: hoạt động lắp đặt thiết bị ngầm tại khu vực mỏ Lan Đỏ – Lan Tây, lô 06.1

Depth of Dinh An-Can Tho fairway from buoys “0” to “16”

The Wu Zhou 8 vessel was lost the ability to control on the waters of Ba Ria – Vung Tau province

(Vietnamese) Về khu vực thi công công trình: Kéo giàn khoan Ocean Quest

Oil exploration on Vietnam offshore