Friday, 29/03/2024

Notice to Mariners

The CV001opening / closing underwater valve on the 16A Bach Ho-Dinh Co gas pipelines, in the CCP Bach Ho drilling rig area

NOTICE TO MARINERS

The CV001opening / closing underwater valve on the 16A Bach Ho-Dinh Co gas pipelines, in the CCP Bach Ho drilling rig area.

No. 68/TBHH-TCTBĐATHHMN dated April 13, 2016

VTU – 12 – 2017

Waters: Ba Ria-Vung Tau province.

VMS-South would like to inform:

PetroVietnam Gas South East Transmission Company will deploy the CV001opening / closing underwater valve project on the 16A Bach Ho-Dinh Co gas pipelines, in the CCP Bach Ho drilling rig area, with the following details:

- Estimated time: 10/4/2017.

- Operated time: 10 days

- Location: CV001 – Riser Block CCP-Bạch Hổ drilling platform, coordinates:

Valve WGS-84
Latitude (j) Longitude (l)
CV-001 9045’22,26” N 107058’59,53’’E

 (Coordinates provided by PetroVietnam Gas South East Transmission Company)

- Characteristic:

Vessel: NASOS II.

Call-sign: 3WGS9.

Flag: Việt Nam.

Size: 53,00m x 12,00m.

NAVIGATION GUIDE

 All mariners should use caution in Ba Ria-Vung Tau waters area, keep clear of CV001 closing/opening underwater valve on the 16A Bach Ho – Dinh Co gas pipelines, in CCP Bach Ho drilling rig area with coordinates and operated ships mentioned above for maritime safety.

- For more information, please contact the PetroVietnam Gas South East Transmission company.


Other notice

Depth of anchor area of Sai Gon Port Joint Stock Company

Depth of waters in front of wharf No.2 and 3 Sai Gon port – Hiep Phuoc of Sai Gon port

New establishment of special buoys no. “B1”, “B2” indicating the construction area to upgrade BP1 Berth on Go Gia River

(Vietnamese) Về thông số kỹ thuật độ sâu luồng hàng hải Định An – Sông Hậu, đoạn luồng từ phao báo hiệu hàng hải số “0” đến phao báo hiệu hàng hải số “16”

(Vietnamese) Thi công nạo vét cảng quân sự 171HQ