NOTICE TO MARINERS
Geochemical surveying activities of oil and gas projects at Lot 114 & 116
offshore Vietnam
No. 48/TBHH-TCTBĐATHHMN dated March 28th, 2019
VTU – 11-2019.
Waters: Offshore Vietnam.
VMS-South would like to inform that:
Eni Vietnam BV will conduct geochemical surveying activities of oil and gas projects at Lot 114 & 116 offshore Vietnam, as follows:
- Surveying area on Lot 116 limited by the coordinates as follows:
Points | WGS-84, Zone 49N | |
Latitude (j) | Longitude (l) | |
1 | 16026’06,8702”N | 108043’11,0385”E |
2 | 16029’50,8670”N | 108043’15,8375”E |
3 | 16029’44,0090”N | 108055’11,3866”E |
4 | 16026’05,1456”N | 108055’10,5438”E |
- Surveying area on Lot 114 limited by the coordinates as follows:
Points | WGS-84, Zone 49N | |
Latitude (j) | Longitude (l) | |
1 | 16054’44,5317”N | 108028’19,2305”E |
2 | 16047’28,9473”N | 108026’24,8274”E |
3 | 16055’439,8832”N | 108024’56,5986”E |
4 | 16048’28,4757”N | 108023’06,5599”E |
- Characteristics of surveying vessel as follows:
- Name: Fugro EQUINOX.
- Nationality: Malaysian.
- Dimensions: Length 60 m; width 16m and depth.4,85m.
- Call sign: C6AJ8.
- Color: Red, White.
- Signal by night: There are signal lights prescribed.
4.Working time: Estimated working time of FURGO EQUINOX in Lot 114 & 116 is 20 days since the vessel approach to the area mentioned above (from 05/4/2019 until 24/4/2019).
NAVIGATION GUIDANCE:
– All vessels navigating in offshore Vietnam should notice to keep clear of FUGRO EQUINOX surveying vessel with characteristics mentioned above at least 02 NM and areas mentioned above for maritime safety.
– For more information, contact Eni Vietnam BV./.
ON BEHALF OF DIRECTOR GENERAL
DEPUTY DIRECTOR GENERAL
Signed and Sealed
Pham Tuan Anh