Friday, 25/04/2025

Notice to Mariners

Surveying ROV and maintenance pipelines STV-RD-BH-LH, TGT-BH & RP3-RC1 in 2018

NOTICE TO MARINERS

Surveying ROV and maintenance pipelines STV-RD-BH-LH, TGT-BH & RP3-RC1 in 2018

  • 139/TBHH-TCTBĐATHHMN dated July 12, 2018

VTU –  21 – 2018.

Waters: Bà Rịa – Vũng Tàu.

VMS-South would like to inform that surveying ROV and repairing free span of STV-RĐ-BH-LH pipeline routes, TGT-BH & RP3-RC1 in 2018 as follows:

  1. Locality:
  • Pipeline router 16” STV-RĐ-BH-LH;
  • Pipeline router 12” TGT-BH;
  • Pipeline router 10” RP3-RC1.
  1. Estimated construction time: date 20/7/2018, projected in 60 days.
  2. Characteristics of PTSC THANH LONG vessel:
  • Nationality: Việt Nam.
  • Mark: XVIH.
  • IMO: 9457244.
  • Size (length x width x heigh): 64.35m x 15m x 6m.

NAVIGATION GUIDANCE:

- All vessels navigating on area should notice keep away from PTSC THANH LONG vessel, with characteristics and pipeline routes for maritime safety.

- For more information contact to PV GAS South East Transmission company.


Other notice

Well drilling construction area SD-22P, STD-WHP-A, Lot 15-1

Depth of waters on Ranh Gia fairway belong to transportation from onshore to Rach Gia island-Phu Quoc, Kien Giang province

The sunken barge in Vung Tau-Thi Vai fairway

The sunken An Phu 868 vessel on Binh Thuan province

The restoration of buoy “0” Vung Tau – Thi Vai fairway