Friday, 12/08/2022

Notice to Mariners

Northern buoy “BC” at Ganh Da Dia reef area, Phu Yen province has been restored to operation

NOTICE TO MARINERS

Northern buoy “BC” at Ganh Da Dia reef area, Phu Yen province has been restored to operation

 No. 191/TBHH-TCTBĐATHHMN dated July 26 ,2021

PYN – TG – 03 – 2021

Waters:  Phu Yen province.

Buoy: “BC”.

Coordianates:

 VN-2000  WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
13021’14,7”N 109018’39,5”E 13021’11,0”N 109018’46,0”E

 

VMS-South would like to inform that: Northern buoy “BC” at Ganh Da Dia reef area, Phu Yen province has been restored to operation:

- Function: Northern safety signal, ships are allowed to navigate north of the signal.

  1. By day:

- Diameter:              2,0m.

- Shape:                  Grid tower.

- Color:                   The top half is black, the bottom half is yellow.

- Top-mark:   Two black cones are placed consecutively vertically, the top of the cone is upward.

- Code:                   letter “BC” white.

- Geographical vision (NM): 1,5 ≤ R ≤1,8.

- Luminous range:   1,5 NM.

  1. By night:
  • Light characteristics: white light, sigle flashing every 1s.

- Luminous range:   02 NM.

NAVIGATION GUIDANCE:

All vessels navigating in Phu Yen fairway based on the Notice to Mariners, paper charts, depth and AtoN system and should have methods of safety navigation.  Absolutely comply with the regulation of Quy Nhon Maritime Administration for maritime safety.

Notice to mariners No. 180/TBHH-TCTBĐATHHMN dated June 30, 2021 is canceled.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Pham Tuan Anh


Other notice

Parameters of the waters in front of wharf, turning basin, the waters towards to fairway of Thi Nai Port

Suspending operation of “real” AIS installed in buoy “0” on Soai Rap fairway

Deploying to connect, trying to test pipes “26”, “16”, the supplementary upgrading infrastructure project of Bach Ho area belongs to Nam Con Son 2 gas pipeline phase 1 Project and Dai Hung Gas Gathering Project

Depth of Hau River (from km 27 + 773.9 to km 30 + 687) of package no.11: Execution Dredging of Hau river and Quan Chanh Bo canal- the construction investment project of works use for large load vessels navigating in and out Hau River

The termination of operation of 02 specialized buoys “R1″, “R3″ for the construction of cooling water discharge pipelines – Song Hau 1 Thermal Power Plant Project