NOTICE TO MARINERS

The restoration of the operation of buoy No.”1″ on Dinh An – Hau river fairway

No. 17/TBHH-TCTBĐATHHMN dated January 16, 2023

 

TVH – TG – 01 – 2023

- Waters: Tra Vinh province

- Fairway: Dinh An – Hau river

- Buoy: No.“1”

Coordinates:

Buoy  VN-2000  WGS-84
Latitude Longitude Latitude Longitude
“1” 09027’42,8”N 106030’06,4”E 09027’39,2”N 106030’12,8”E

VMS-South would like to inform that: The buoy No.“1” on Dinh An – Hau river fairway that is restored operation as notice to mariners.

Notice to mariners No.12/TBHH-TCTBĐATHHMN dated January 12, 2023 of VMS-South that is cancelled


Other notice

Execution area: Moving AtoN buoy “GR” on Vung Tau-Thi Vai fairway

Depth of anchoring and transshipment area in Cam Ranh Bay – Khanh Hoa Province

(Vietnamese) Về việc chấm dứt hoạt động: Phao báo hiệu chướng ngại vật nguy hiểm khống chế vị trí tàu kéo SG 5520 bị chìm trên luồng Sài Gòn – Vũng Tàu

(Vietnamese) Về việc chấm dứt hoạt động các phao báo hiệu hàng hải chuyên dùng phục vụ thi công công trình Nạo vét luồng chung, luồng riêng, bến, vũng quay tàu Cảng biển Trung tâm Điện lực Duyên Hải.

The parameters depth of the fairway section Cai Mep-Thi Vai (from the upstream of CMIT Terminal to the upstream of Cai Mep New Port Terminal (TCIT and TCCT) belongs to the package CM-XL02 – The construction of Cai Me-Thi Vai upgrade fairway route project