Friday, 29/03/2024
Sorry, this entry is only available in Vietnamese.
Annual dredging work for Vung Tau – Thi Vai channel 2014
Pulling Hakuryu-5 rig to block 12W – Chim Sao mine
Removing buoy “3” on the fairway section belongs to the Duyen Hai Thermal Power Center seaport project, Tra Vinh province
New establishment of 10 AtoN buoys indicating the specialized fairway used for vessels with large loads on Song Hau River
New establishment of 02 specilaized buoys “DH1”, “DH2” which is limitted the construction area of the port maintenance and fairway receiving the cooling water center of the Duyen Hai Power Center (package SXKD2022NVDT-02)