Tuesday, 18/03/2025

Notice to Mariners

The temporarily stopped operation of AtoN buoy no. “22” on Dinh An – Hau River fairway.

NOTICE TO MARINERS

The temporarily stopped operation of AtoN buoy no. “22” on Dinh An – Hau River fairway.

No.30/TBHH-TCTBĐATHHMN dated January 24, 2025

TVH- TG – 04 – 2025

  • Waters: Tra Vinh Province

- Fairway: Dinh An – Hau River.

- AtoN buoy no.: “22”

- Geographical coordinates:

AtoN buoy no. VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
“22” 09°31’51,9″N 106°20’49,2″E 09°31’48,3″N 105°20’55,6″E

 

 

VMS-South would like to inform that AtoN buoy no. 22” on Dinh An – Hau River fairway has been temporarily stopped operation since January  23, 2025./.


Other notice

(Vietnamese) Về việc thi công nạo vét duy tu luồng sông Dinh năm 2013

Parameters depth of the waters in front of wharfs “BP2”, “BP3”, “BP8”, “BP9”, “BP11” on Go Gia river

The temporarily stopped operation of AIS “real” installed on AtoN buoy no. “8” on the fairway used for large load ships entry and exit of Hau River

(Vietnamese) Thay đổi đặc tính ánh sáng Đèn biển Ba Động – Trà Vinh

The removing of AtoN temporary buoys “0”, “1” on the fairway section belongs to the Duyen Hai Thermal Power Center seaport project, Tra Vinh province