Thursday, 04/06/2020

Notice to Mariners

Filippo Brunelleschi vessel to execute the construction package of Long Son petrochemical refinery project

NOTICE TO MARINERS

Filippo Brunelleschi vessel to execute the construction package of Long Son petrochemical refinery project

No. 37/TBHH-TCTBĐATHHMN dated March  25, 2020

VTU  –  10 – 2020

Waters:  Bà Rịa – Vũng Tàu province.

VMS-Sputh would like to inform that:

Dolphin Logistics Co., Ltd using Filippo Brunelleschi vessel to execute the construction package of Long Son petrochemical refinery project in Vung Tau waters:

  1. Area Filippo Brunelleschi vessel operates:
Point VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
1 10024’06,9” N 107002’10,5” E 10024’03,2” N 107002’16,9” E
2 10025’34,8” N 107002’26,9” E 10025’31,1” N 107002’33,3” E
3 10025’38,5” N 107002’32,0” E 10025’34,8” N 107002’38,5” E
4 10025’44,8” N 107002’33,1” E 10025’41,1” N 107002’39,5” E
5 10026’02,1” N 107002’29,3” E 10025’58,4” N 107002’35,7” E
6 10026’11,4” N 107002’21,4” E 10026’07,7” N 107002’27,8” E
7 10026’52,6” N 107002’59,1” E 10026’48,9” N 107003’05,5” E
8 10026’56,7” N 107002’53,2” E 10026’52,9” N 107002’59,6” E
9 10025’56,4” N 107001’57,9” E 10025’52,8” N 107002’04,4” E
10 10025’44,2” N 107002’00,0” E 10025’40,5” N 107002’06,5” E
11 10025’36,1” N 107002’19,8” E 10025’32,4” N 107002’26,2” E
12 10024’24,1” N 107002’06,4” E 10024’20,5” N 107002’12,8” E

* Coordianates was provided by Dolphin Logistics Co., Ltd.

  1. Characteristics of Filippo Brunelleschi vessel:

- Name: Filippo Brunelleschi.

- Diamension: length 142m; width 28,0m; draft 6,0m.

- Color: grey.

- Call-sign: LXBF.

- Nationality: Luxembourg.

- Signal at night : There are signal lights as prescribed.

  1. Operation time: Up to June 25, 2020.

- More information contact Dolphin Logistics Co., Ltd

.NAVIGATION GUIDANCE:

All vessels navigating in Bà Rịa – Vũng Tàu fairway area based on the Notice to Mariners, paper charts, depth and AtoN system and should have methods for maritime safety./.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Tran Duc Thi


Other notice

Pull Java Star 2 rig from PTSC port – Vung Tau to lot 42 to well drilling PQ-1X

The pipelay process 2014 – Nam Con Son 2 oil pipelines Project – Phase 1

The new establishment of buoy “SR” marks to maritime safety on East Soai Rap fairway

22/TBHH-TCTBĐATHHMN – Tractor LA 05319 was sunk on Sai Gon – Vung Tau channel

Depth of Ba Ngoi fairway