Tuesday, 29/11/2022

Notice to Mariners

Changing characteristics of the operation of buoys “S1″ on Saigon – Vung Tau fairway

NOTICE TO MARINERS

Changing characteristics of the operation of buoys “S1″ on  Saigon – Vung Tau fairway

No. 263/TBHH-TCTBĐATHHMN dated November 25, 2018

HCM – TG – 57 – 2019

Waters:                    Hồ Chí Minh city

Fairway:        Sài Gòn – Vũng Tàu

Buoy:             “S1”

Coordinates:

Buoy VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Kinh độ (l)
“S1” 10°32’44,8”N 106°50’52,8”E 10°32’41,1”N 106°50’59,2”E

VMS-South would like to inform that: Changing characteristics of the operation of buoys “S1” on Sài Gòn – Vũng Tàu fairway, as follow:

  1. Changing position of buoys “S1” to new ones, as follow:
Buoy VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“S1” 10°32’34,6”N 106°50’44,1”E 10°32’31,0”N 106°50’50,5”E

Other characteristics of the above signal buoys are not changed

NAVIGATION GUIDANCE:

All vessels navigating on Sài Gòn – Vũng Tàu fairway should notice mooring buoy with characteristics mentioned above, keep watching, and comply strictly with the regulation of Hồ Chí Minh Maritime Administration for maritime safety.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Tran Duc Thi


Other notice

The new establishment of special buoy “KB1”, “KB2”, “KB3”, “KB4”, “KB5”, “KB6” ,”KB7”, “KB8” marks construction electric line 220kV Kiên Bình – Phú Quốc, Kiên Giang province

Change characteristics of Ba Kiem lighthouse

About fishing stake on fairway Vung Tau – Thi Vai

The new establishment of buoy “ĐH1”, “ĐH2”, “ĐH3” serving the construction of Dong Hai Wind Power Plant Project 1

Parameters depth of Tat canal completed the construction of dredging and maintenance of the navigation channel has been completed for large tonnage ships entering the Hau River.