Tuesday, 13/05/2025

Notice to Mariners

Changing characteristics of the operation of buoys “S1″ on Saigon – Vung Tau fairway

NOTICE TO MARINERS

Changing characteristics of the operation of buoys “S1″ on  Saigon – Vung Tau fairway

No. 263/TBHH-TCTBĐATHHMN dated November 25, 2018

HCM – TG – 57 – 2019

Waters:                    Hồ Chí Minh city

Fairway:        Sài Gòn – Vũng Tàu

Buoy:             “S1”

Coordinates:

Buoy VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Kinh độ (l)
“S1” 10°32’44,8”N 106°50’52,8”E 10°32’41,1”N 106°50’59,2”E

VMS-South would like to inform that: Changing characteristics of the operation of buoys “S1” on Sài Gòn – Vũng Tàu fairway, as follow:

  1. Changing position of buoys “S1” to new ones, as follow:
Buoy VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“S1” 10°32’34,6”N 106°50’44,1”E 10°32’31,0”N 106°50’50,5”E

Other characteristics of the above signal buoys are not changed

NAVIGATION GUIDANCE:

All vessels navigating on Sài Gòn – Vũng Tàu fairway should notice mooring buoy with characteristics mentioned above, keep watching, and comply strictly with the regulation of Hồ Chí Minh Maritime Administration for maritime safety.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Tran Duc Thi


Other notice

Parameters depth of Dinh An-Song Hau fairway, the section from Buoys no. “0” to “16”

Annual dredging work for Quy Nhon channel 2014

Technical specifications Phuoc Mai light-house – Binh Dinh province

Parameter depth of Quy Nhon fairway

Change characteristics of AtoN buoys no. “1”, “2” on Vung Tau – Thi Vai fairway and no. “2” on Sai Gon – Vung Tau fairway which belongs to the investment and construction project to upgrade the Cai Mep – Thi Vai fairway from AtoN “0” entry of Cai Mep Container Wharf