Saturday, 22/03/2025

Notice to Mariners

The construction of Phuoc An bridge in Phu My town, Ba Ria – Vung Tau province and Nhon Trach district, Dong Nai province

NOTICE TO MARINERS

The construction of Phuoc An bridge in Phu My town, Ba Ria – Vung Tau province and Nhon Trach district, Dong Nai province

No. 197/TBHH-TCTBĐATHHMN dated September  7, 2023

VTU – 37– 2023

Water: Ba Ria-Vung Tau province.

Fairway: Vung Tau – Thi Vai.

VMS-South would like to inform that the construction of Phuoc An bridge in Phu My town, Ba Ria – Vung Tau province and Nhon Trach district, Dong Nai province:

  1. Operating time: From September 3, 2023.
  2. Location coordinates of 02 main pillars on Vung Tau – Thi Vai fairway
No. Pillars VN-2000

(KTT 107045’, projection zone 30)

WGS-84
Latitude Longitude Latitude Longitude
1 T38 10037’58,24” N 106059’46,48” E 10037’54,54” N 106059’52,98” E
2 T39 10038’00,57” N 106059’38,60” E 10037’56,87” N 106059’45,10” E
  1. The vehicles involved in the construction include: Barges, Tugboats.

NAVIGATION GUIDANCE

Vessels navigating on Vung Tau – Thi Vai fairway, pay attention to keep safe distance to the area where the barge is sunk has the coordinates mentioned above with characteristics mentioned above for maritime safety. Communication and absolutely comply with appointment of Maritime Administration of Vung Tau.

Furthermore information conatct to Traffic Project Management Board in Cai Mep – Thi Vai port area


Other notice

The new establishment of buoys “26A” on Vung Tau – Thi Vai fairway

Construction of exploration drilling campaign in 2021 at Lot 114 of Eni Vietnam BV in the city Ho Chi Minh City Lot 114

The temporarily stopped operation of “Real” AIS AtoN mark installed on AtoN buoys no. “2” on Sai Gon – Vung Tau fairway

Depth of waters in front of SCC-VN Thi Vai port

Depth of Soai Rap fairway