NOTICE TO MARINERS
Carry out piling and construction of Cai Mep Gemadept – Terminal Link port on on Vung Tau – Thi Vai fairway
No. 66/TBHH-TCTBĐATHHMN dated April 10, 2019
VTU – 15 – 2019
Waters: Bà Rịa – Vũng Tàu province.
Fairway: Vũng Tàu – Thị Vải.
VMS-South would like to inform that: Gemadept – Terminal Link Cai Mep Terminal Joint Stock Co., will carry out piling and construction of Cai Mep Gemadept – Terminal Link port on Vung Tau – Thi Vai fairway, as follows:
- The construction area of piling and construction of Cai Mep Gemadept – Terminal Link port by the following coordinates:
Point | VN-2000 | WGS-84 | ||
Latitude (j) | Longitude (l) | Latitude (j) | Longitude (l) | |
1 | 10029’26,1”N | 106059’53,3”E | 10029’22,4”N | 106059’59,8”E |
2 | 10029’26,1”N | 107000’06,5”E | 10029’22,5”N | 107000’12,9”E |
3 | 10030’11,7”N | 106059’53,2”E | 10030’07,9”N | 106059’59,7”E |
4 | 10030’11,7”N | 107000’03,1”E | 10030’08,0”N | 107000’09,5”E |
- Means of participation in construction include: Ships with piles, barges containing piles, barges for cranes (floating bridges) and tugs.
- Time: expected 24 months (from April 10, 2019).
NAVIGATION GUIDANCE:
All vessels navigating on Vung Tau –Thi Vai fairway should notice mooring buoy with characteristics mentioned above, keep watching, and comply strictly with the regulation of Vung Tau Maritime Administration for maritime safety.
More information contact to Gemadept – Terminal Link Cai Mep Terminal Joint Stock Co.,