Notice to Mariners

Carry out piling and construction of Cai Mep Gemadept – Terminal Link port on on Vung Tau – Thi Vai fairway

NOTICE TO MARINERS

Carry out piling and construction of Cai Mep Gemadept – Terminal Link port on on Vung Tau – Thi Vai fairway

No. 66/TBHH-TCTBĐATHHMN dated April 10, 2019

VTU – 15 – 2019

Waters: Bà Rịa – Vũng Tàu province.

Fairway: Vũng Tàu – Thị Vải.

VMS-South would like to inform that: Gemadept – Terminal Link Cai Mep Terminal Joint Stock Co., will carry out piling and construction of Cai Mep Gemadept – Terminal Link port on Vung Tau – Thi Vai fairway, as follows:

  1. The construction area of ​​piling and construction of Cai Mep Gemadept – Terminal Link port by the following coordinates:
Point VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
1 10029’26,1”N 106059’53,3”E 10029’22,4”N 106059’59,8”E
2 10029’26,1”N 107000’06,5”E 10029’22,5”N 107000’12,9”E
3 10030’11,7”N 106059’53,2”E 10030’07,9”N 106059’59,7”E
4 10030’11,7”N 107000’03,1”E 10030’08,0”N 107000’09,5”E
  1. Means of participation in construction include: Ships with piles, barges containing piles, barges for cranes (floating bridges) and tugs.
  2. Time: expected 24 months (from April 10, 2019).

NAVIGATION GUIDANCE:

All vessels navigating on Vung Tau –Thi Vai fairway should notice mooring buoy with characteristics mentioned above, keep watching, and comply strictly with the regulation of Vung Tau Maritime Administration for maritime safety.

More information contact to Gemadept – Terminal Link Cai Mep Terminal Joint Stock Co.,


Other notice

Technical specifications Trieu Duong light-house – Binh Thuan province

Depth of waters on Phu Quy fairway

Depth of waters in front of 30.000DWT wharf -Cong Thanh cement Port

(Vietnamese) Thông số kỹ thuật độ sâu khu chuyển tải tại cửa sông Bàn Thạch tỉnh Phú Yên

Depth of waters Dong Nai fairway