NOTICE TO MARINERS

Dredging works for V2 wharf of SP-PSA 

No.250/TBHH-TCTBĐATHHMN dated December 09, 2016

 

VTU - 73 2016

  • Waters: Ba Ria – Vung Tau
  • Fairway: Vung Tau – Thi Vai

Southern Vietnam Maritime Safety Corporation would like to inform: Sao Mai Marine Co, Ltd., has carried out dredging V2 wharf of SP-PSA as follows:

  1. Dredging area, dumping ground:

- Dredging area: V2 wharf of SP-PSA

- Dumping ground: is limited by the circle with radius R=2.500m, center point has following co-ordinates:

Point VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
Dumping ground 10012’43,2” N 107014’05,7” E 10012’39,5” N 107014’12,2” E
  1. Execution means: Dredger, self-propelled barge and tug boat.
  2. Execution duration: 31/01/2017

NAVIGATION GUIDANCE

All vessels navigating on Vung Tau – Thi Vai fairway through execution area mentioned above should slow down, increase watch and communicate with other units at site by VHF for maritime safety.


Other notice

Construction area of ​​the project “Dredging and maintenance of the water area in front of POSCO port”

Depth of waters in temporary transshipment area at Duyen Hai – Tra Vinh of Quang Minh Logistics Development Joint Stock Company

New establishment of 04 AtoN buoys “HM1”, “HM2”, “HM3”, “HM4” on Dong Nai fairway, section from Den Do cape to Ong Nhieu canal

The position of pillar and the lowest height of the cable car Hon Thom – Phu Quoc, Kien Giang province

91/TBHH-TCTBĐATHHMN – DEPTH OF CUATIEU SONGTIEN FAIRWAY