FOR REFERENCE NOTICE TO MARINERS Execution of maintenance dredging on Song Dinh fairway

FOR REFERENCE

NOTICE TO MARINERS

Execution of maintenance dredging on Song Dinh fairway

150/TBHH-TCTBĐATHHMN on 24 August 2015

VTU – 59 – 2015

– Territorial waters: Ba Ria-Vung Tau

– Fairway: Song Dinh

Hoang Khang Ltd,.Co will carry out execution of maintenance dredging on Song Dinh fairway with details as follows:

  1. Means including: Grab dredger (dredging machine), barge blow-down, tugboat
  2. Dumping position: The radius is 06km with the center point has coordinates as follows:
Position VN-2000 WGS-84
Longitude (j) Latitude (l) Longitude (j)

 

 

Latitude (l)
Dumping position 10°13’31,8’’N 107°12’10,7’’E 10°13’28,1’’N 107°12’17,1’’E
  1. Dredging zone:
    • Zone 1 : From offshore (border on Vung Tau-Thi Vai fairway) to Vietsovpetro wharf
    • Zone 2 : From Vietsovpetro wharf to upstream of Vina offshore wharf + 200m

– Zone 3 : The section from upstream of Vina offshore wharf + 200m to the turning basin in Cay Khe confluence.

  1. Execution period: approximately 40 days from August 25, 2015

NAVIGATION GUIDANCE:

All means navigating on Song Dinh fairway should slow down, increase watch out and communicate by VHF if necessary for maritime safety.


Other notice

Depth of waters on Dinh An – Hau river fairway, section fairway: from buoy No. “0” to buoy No. “16”

The new establishment of buoy on specialized fairway to Van Phong Petroleum port, Khanh Hoa province

Depth of waters in front of SCC-VN Thi Vai port

The parameters depth of Dong Tranh – Go Gia fairway

(Vietnamese) Về việc tàu Ngân Hà 08 (số ĐKHC: CT-01377) bị chìm trên tuyến luồng hàng hải Hà Tiên, tỉnh Kiên Giang