Monday, 13/01/2025
Sorry, this entry is only available in Vietnamese.
The depth of waters in front of Tan Cang Hiep Phuoc wharf, leading ways to fairway and 2.000DWT wharf on Dong Dien River
Depth of waters in front of wharf No. 22 – width area 48,2m (barges 3.000DWT) and wharf No. 3 (wharf K1 + K3 – 5.000DWT) – Dong Nai Port
The parameters depth of Quy Nhon fairway.
Seismic and geological survey of oil and gas projects at Block 114
Termination of operation of 04 buoys, specialized signals “TH1″, “TH2″, “TH3″ and “TH4″ belonging to the National Power Supply Works project for Tien Hai commune, Kien Giang province