Saturday, 22/03/2025
Sorry, this entry is only available in Vietnamese.
Terminated operation of AtoN buoy no. “4A”, “5A”, “6A” on Dinh An – Song Hau fairway
Depth of waters, scanning obstruction of waters in front of wharf, specialized turning basin at Vinh Tan 1 Thermal Power Company
Depth of waters in front of wharf No. 1 for 30.000DWT vessels – Long An port
The construction of dredging and maintenance of the hydroelectric power station area in front of the oil port 10.000DWT of wharfs no. 1 and 2 – PVOIL Eastern region
Depth of waters in front of of downstream in PTSC port