Thursday, 20/03/2025

Notice to Mariners

New establishment of specialized buoys “B1”, “B2” that marking construction area of ​​Ca Mau wind power plant 1B

NOTICE TO MARINERS

New establishment of specialized buoys B1”, “B2” that marking construction area of ​​Ca Mau wind power plant 1B

No. 82/TBHH-TCTBĐATHHMN dated April 06, 2022

CMU – TG – 02 – 2022

  • Waters: Ca Mau province

- Marking: Buoys “B1”, “B2”

VMS-South wouldliek to inform that New establishment of specialized buoys “B1”, “B2” that marking construction area of ​​Ca Mau wind power plant 1B:

- Position: Ca Mau waters.

- Coordinates:

Buoys  VN-2000  WGS-84
Latitude Longitude Latitude Longitude
“B1” 08˚52’28,75″N 105˚22’54,29″E 08˚52’25,10″N 105˚23’00,69″E
“B2” 08˚50’53,67″N 105˚22’07,20″E 08˚50’50,02″N 105˚22’13,60″E

- Function: marking of water area with construction works in Ca Mau wind power plant 1B

  1. Day time
  • Shape: Tower;
  • Buoy: D = 2,0 m;
  • Color: Yellow;
  • Top-mark: letter “X” yellow;
  • Number: “B1”, “B2”, red;
  • The whole height of 4.7 m takes into account the water level
  1. Night time
  • Light characteristics: yellow light, group flashing (3+1), every 18,0s;
  • Lighting scope: 3600
  • Focal plane height: 3,9 m from top-mark to water surface.
  • Luminous range: 2,5 with the height of Atmospheric transmissibility T = 0,74.

NAVIGATION GUIDANCE:

          All means navigating on Ca Mau waters, pay attention to special buoys mentioned above, navigating following AtoN system, keep watching, keep smoothly communication, and absolutely comply with the appointment of Maritime Administration of Kien Giang./.

          For further information, please contact to Ca Mau 1b Energy Joint Stock Company.


Other notice

Technical specifications Hon Nua light-house – Phu Yen province

The construction site area: Dai Ngai 1 Construction Site Area – The investment and building Dai Ngai Bridge Project on Highway 60 in Tra Vinh, Soc Trang Provinces areas.

A half submerged barge named TG.20000 is sinking on the fairway for large load ships entry of Hau River

The temporarily stopped operation of AIS “real” installed on AtoN buoy no. “8” on the fairway used for large load ships entry and exit of Hau River

Depth of waters in front of Mekong petroleum storage