Thursday, 20/03/2025

Notice to Mariners

Depth of Dinh An – Song Hau fairway, section from “0” to buoy “16”

NOTICE TO MARINERS

Depth of Dinh An – Song Hau fairway, section from “0” to buoy “16”

No.  190/TBHH-TCTBĐATHHMN dated Sep 28,2018

TVH – 19 – 2018.

Waters: Trà Vinh province.

Fairway: Định An – Sông Hậu.

VMS-South would like to inform that:

        Within surveyed bottom of fairway designs 100m in width, is limited and guided by AtoN system, section from buoy “0” to buoy “16” on Dinh An – Song Hau fairway with 17.7km in length, depth in meters to Chart Datum:

  1. Section from buoy “0” to downstream buoy “3” – 440m, 2.25km in length, depth in meters to Chart Datum is over 3,0m.
  2. Section from buoy “3” – 440m to upstream buoy “6” + 950m, 2,9km in length, depth in meters to Chart Datum is over 1,2m.
  3. Section from buoy “6” + 950m to downstream buoy “7” – 500m, 2,7km in length, depth in meters to Chart Datum is over 2,2m.
  4. Section from downstream buoy “7” – 500m to upstream buoy “8” + 455m, 1,15km in length, depth in meters to Chart Datum is over 1,7m.
  5. Section from upstream buoy “8” + 455m to buoy “12”, 3,4km in length, depth in meters to Chart Datum is over 2,1m.
  6. Section from buoy “12” to buoy “16”, 5,3km in length, depth in meters to Chart Datum is over 4,0m.

NAVIGATION GUIDANCE:

All vessels navigating on Dinh An – Song Hau fairway should follow Notice to Mariners, paper chart and AtoN system to have methods of safety navigation, and absolutely comply with the Administration of Can Tho for maritime safety.


Other notice

The new establishment of specialized buoys “P1”,”P2” belong to Tran De wharf construction-Soc Trang

The sunken M/v barge BV – 1984 in AtoN buoy no. “24” position on Soai Rap fairway

The barge sank in the downstream of beacon No.“42” of the Saigon – Vung Tau fairway

(Vietnamese) Về việc hoàn thành trục vớt và di dời tàu NGÂN HÀ 08 (CT-01377) bị chìm trên tuyến luồng hàng hải Hà Tiên, tỉnh Kiên Giang

Depth of Dong Nai fairway