Friday, 22/10/2021

Notice to Mariners
Find by condition
Find by date
Số/ Thời gian ban hành Notice to Mariners
240/TBHH-TCTBĐATHHMN 11-10-2021 The termination of the buoy No.”65” Sai Gon – Vung Tau fairway View details
239/TBHH-TCTBĐATHHMN 11-10-2021 Depth of waters common fairway in and out of Duyen Hai Power Center Wharf (boundary section P8A, T11A, T10, P7A) View details
238/TBHH-TCTBĐATHHMN 11-10-2021 Depth of waters at mooring buoy BP4, BP9 và BP10 area View details
237/TBHH-TCTBĐATHHMN 08-10-2021 Depth of waters Tien river View details
236/TBHH-TCTBĐATHHMN 07-10-2021 Depth of waters in front of Clinker port on Soai Rap river View details
235/TBHH-TCTBĐATHHMN 07-10-2021 Depth of waters mooring area in front of wharf V1, V2, V3 and V4 – Vietnam International Container Terminals (VICT) View details
234/TBHH-TCTBĐATHHMN 05-10-2021 Depth of of waters for tonnage large vessels into Hau river View details
233/TBHH-TCTBĐATHHMN 04-10-2021 Depth of waters in front of barge and fairway out Cai Mep Gemadept -Terminal Link Phase 1 View details
232/TBHH-TCTBĐATHHMN 27-09-2021 The new establishment of construction area 3D seismic survey works Lot 16-1/15 off the continental shelf of Vietnam View details
231/TBHH-TCTBĐATHHMN 22-09-2021 Regarding the termination of the operation of specialized maritime signaling buoys for the construction of dredging works to maintain navigation channels for large tonnage ships entering the Hau River in 2020 View details
230/TBHH-TCTBĐATHHMN 11-09-2021 Depth of fairway for large tonnage ships entering the Hau River after the dredging and maintenance of the Quan Chanh Bo canal section (from pier “25” to pier “33” and from Lang Sat ferry to Hau river). View details
229/TBHH-TCTBĐATHHMN 10-09-2021 The technical specifications of the water area in front of the port dedicated to serving Duyen Hai 2 Thermal Power Plant View details
227/TBHH-TCTBĐATHHMN 17-09-2021 About the construction site: towing PV Drilling VI from anchorage H19-Vung Tau to Block 15-2/01 to drill HSD-7P well View details
226/TBHH-TCTBĐATHHMN 17-09-2021 The parameters depth of Dong Tranh – Go Gia fairway View details
225/TBHH-TCTBĐATHHMN 15-09-2021 Parameters depth of fairway for large tonnage ships entering the Hau River after dredging and maintenance of QUan Chanh Bo canal from beacon pillar no. “33” to Lang Sat ferry. View details
224/TBHH-TCTBĐATHHMN 14-09-2021 The new establishment of buoy “H1”, “H2” “M” control the position of the ship My An 1 sunk at anchorage I8 of Vung Tau anchorage View details
223/TBHH-TCTBĐATHHMN 14-09-2021 About the ship My An 1 sunk at anchorage I8 of Vung Tau anchorage View details
222/TBHH-TCTBĐATHHMN 13-09-2021 The main light of the Ke Ga lighthouse has been restored View details
221/TBHH-TCTBĐATHHMN 10-09-2021 The new establishment of buoy “H1”, “H2” serving the construction of Tan Thuan wind power plant phase 1 and phase 2 View details
220/TBHH-TCTBĐATHHMN 08-09-2021 Parameters depth of fairway for large tonnage ships entering the Hau River after dredging and maintenance. View details