Thursday, 02/05/2024

Notice to Mariners

The construction works that salvage of M/V Xuan Dao 45 vessel

NOTICE TO MARINERS

The construction works that salvage of M/V Xuan Dao 45 vessel

No. 67/TBHH-TCTBĐATHHMN dated March 24, 2022

VTU – 11 – 2022

Waters: Ba Ria – Vung Tau Province.

 

Southern Vietnam Maritime Safety Coporation would like to inform that establishment of the construction works that salvage of M/V Xuan Dao 45 vessel, is limited by a circle with a radius of 100 m, centered at the position with coordinates as follows:

No. VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
1 10019’19,7″N 107006’55,6″E 10019’16,0″N 107007’02,0″E
  • Construction time: From March 23, 2022 to the end of April 22, 2022;
  • Characteristics of vehicles:

+ Construction means: Yet Kieu P3 Crane;

+ Dimension: 40,20 m x 20,60 m x 3,6 m; Chiều cao tĩnh không: 25,00 m;

+ Color: Green body, yellow crane.

NAVIGATION GUIDANCE:

All means navigating on Ba Ria-Vung Tau waters, pay attention to special buoys mentioned above, navigating following AtoN system, keep watching, keep smoothly communication for maritime safety./.

          For further information, please contact to VietNam Salvage Joint Stock Company ([1])./.

([1]) Tổ chức cung cấp số liệu, thông tin phục vụ việc công bố thông báo hàng hải chịu trách nhiệm trước pháp luật về sự chính xác của số liệu, thông tin mình cung cấp theo khoản 3, điều 47, Nghị định số 58/2017/NĐ-CP.


Other notice

Depth of waters in front of wharf 15.000DWT in Vopak (Vietnam) Co., Ltd

Depth of waters in front of SSIT, Tan Thanh Ward, Ba Ria – Vung Tau Province

Depth of waters at mooring buoy Truong An 01 and Truong An 06 of Truong An Transport And Trading Joint Stock Company

(Vietnamese) Thiết lập mới phao báo hiệu hàng hải an toàn phía Tây “W” tại khu vực bãi đá ngầm khu vực cảng Đồng Nai thuộc tuyến luồng hàng hải Đồng Nai, đoạn từ rạch Ông Nhiêu đến hạ lưu cầu Đồng Nai

Technical specifications Cu Lao Xanh light-house – Binh Dinh province