Monday, 28/04/2025

Notice to Mariners

Depth of waters connecting to wharf No. 5 that for vessels load to 70.000 DWT – Long An international port

NOTICE TO MARINERS

Depth of waters connecting to wharf No. 5 that for vessels load to 70.000 DWT – Long An international port

 No. 252/TBHH-TCTBĐATHHMN dated November 6, 2023

HCM – 41 – 2023.

Waters: Ho Chi Minh city.

Fairway: Soai Rap.

VMS-South would like to infrom that Depth of waters connecting to wharf No. 5 that for vessels load to 70.000 DWT – Long An international port:

  1. Within surveyed waters connecting to wharf No. 5:
Point  VN2000  WGS-84
Latitude Longitude Latitude Longitude
B2 10°32’41,2”N 106°44’17,3”E 10°32’37,5”N 106°44’23,8”E
B3 10°32’45,8”N 106°44’16,4”E 10°32’42,1”N 106°44’22,9”E
B5 10°32’42,7”N 106°44’25,4”E 10°32’39,0”N 106°44’31,8”E

The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 9,5 m.

  1. Within surveyed and scanned th3 eobstruction that is limitted by coordinates above. There is no any the obstruction

Data based on chart symbols LA45_2310 ratio 1/1000 and RA_LA45_2310 ratio 1/1000 was measured by Southern Maritime Hydro-Survey Company, completed in Octorber, 2023.

Furthermore information conatct to Long An Port Joint Stock Company.


Other notice

Maintenance dredging works on Quy Nhon fairway 2015

Depth of waters Dinh An – Hau river fairway, section from buoy No. “0” to buoy No. “16”

(Vietnamese) Về thông số kỹ thuật độ sâu của vùng nước cảng Vietsovpetro

Characters modification of buoy “GR” on Vung Tau – Thi Vai fairway

Depth of Tat canal fairway from Km 0-650 (Km 30+687 -:- Km 31 +332,5 of package 11) to Km 8+175 of package 6A, 6B and fairway section from Km 0+000 đến Km 0+678 of package 10B – the fairway project which used for large load vessels navigating in and out Hau River.